DNYUZ
  • Home
  • News
    • U.S.
    • World
    • Politics
    • Opinion
    • Business
    • Crime
    • Education
    • Environment
    • Science
  • Entertainment
    • Culture
    • Music
    • Movie
    • Television
    • Theater
    • Gaming
    • Sports
  • Tech
    • Apps
    • Autos
    • Gear
    • Mobile
    • Startup
  • Lifestyle
    • Arts
    • Fashion
    • Food
    • Health
    • Travel
No Result
View All Result
DNYUZ
No Result
View All Result
Home News

Battery Park City flooding project could ‘doom’ boating businesses faced with closing marina

September 17, 2025
in News
Battery Park City flooding project could ‘doom’ boating businesses faced with closing marina
494
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

They’re being left high and dry.

A construction project meant to protect Battery Park City from the next Superstorm Sandy could wash away business for a group of charter boat captains who call the ritzy Manhattan waterfront docks their home.

North Cove Marina, the Big Apple’s most expensive harbor, will shut down this fall for the next five years as crews build a massive seawall along the coast — leaving nautical business owners floundering to find a new spot in the city’s dwindling marina spaces.

“We’ve been able to weather all the storms so far. This one is one that we obviously can’t,” said James Brooks, captain of the Ventura, a 104-year-old sailing vessel.

James Brooks in front of his docked boat, the Ventura.
James Brooks fears that he will not find a marina to operate his 104-year-old vessel and his chartering business out of. Matthew McDermott

The Ventura has been at North Cove since the 1980s — and was part of an heroic brigade that evacuated 9/11 survivors out of Lower Manhattan after the attack on the World Trade Center.

The North/West Battery Park City Resiliency (NWBPCR) project involves integrating a coastal flood barrier management system along the Hudson River waterfront from First Place to Chambers Street to mitigate the “long-term impacts of sea level and increasingly erratic weather.”

A new seawall would prevent the effects of another storm like Hurricane Sandy, which caused roughly $310 million in damage in Battery Park City alone when it slammed the Big Apple in 2012.

View of North Cove Marina.
North Cove Marina is estimated to be closed until 2031 as the area undergoes a flood mitigation project. Matthew McDermott

Construction will kick off when the marina season ends on Oct. 31 this year — and is expected to last through 2031.

“Due to public safety considerations during active construction, and as outlined in our many public presentations, EIS documents, and over more than a year of public discussion, North Cove Marina will not be operational during the course of the [NWBPCR],” Nick Sbordone, a spokesperson for the BPCA, said.

Brooks, 38, has been searching for a new home for the Ventura for months, but has been unnerved by the dwindling marina space throughout the Big Apple.

Brooks at the wheel of the Ventura.
The Ventura was part of the heroic brigade that evacuated 9/11 survivors out of the World Trade Center after the Twin Towers crumbled. Matthew McDermott

Nearby marinas, like the 79th Street Boat Basin and the Newport Marina in New Jersey, have closed, while others, such as the Inwood Marina, are slated to undergo their own projects this year. Pier 25 does not have docks long enough to support the Ventura’s 70-foot length, and the Chelsea Piers has warned it is at capacity and has a long waiting list.

Brooks is eyeing the Brooklyn Bridge Marina on the East River, but worries the new spot will not satisfy his clientele — as much as 75% of his business comes from repeat customers, like Manhattan-based companies throwing staff parties and those who live in the neighborhood, who likely will not commute to Brooklyn for a boat ride.

“It’s really sad. I don’t have a very positive feeling right now about the future of the business and the boat right now,” said Brooks.

David Caporale behind the wheel of Tara, his boat.
David Caporale fears his plans to use his Tribeca Sailing business as his retirement fund will be sunk with the marina closure. Matthew McDermott

“It feels like we’re losing our home … We’re trying to avoid having a situation that basically dooms this piece of American history.”

Representatives from Brookfield Place, the shopping mall that oversees the marina, told The Post its marina operator had warned seasonal marina customers about the anticipated closure — but the tenants said the claim was far from the truth.

David Caporale, captain of Tribeca Sailing and resident of the waterfront buildings, said he only learned about the NWBPCR because he happened to attend a community board meeting while the “seawall project” was being discussed.

David Caporale in front of the Tara.
Caporale learned about the marina closure from a community board meeting and broke the news to his fellow marina tenants. Matthew McDermott

As the marina’s “unofficial mayor,” he broke the news to other tenants, who similarly had not been aware of the plan. Documents dating back to 2019 are on the BPCA website, but Caporale was quick to point out that none of the tenants would make use of the page.

“We were just an afterthought,” said Caporale, 66, a former video editor-turned-boating captain.

If the charter captain cannot find a new marina to home his beloved boat, Tara, he fears he will be forced to sell the business at a substantial discount and be forced into an early retirement.

“This was planned to be my retirement money. That all goes away with the closure of this Marina,” said Caprale.

“This was my retirement job. My retirement business plan, including 401K, was running this business until forever. Now that that’s gone, my retirement plan has changed — and for a reason which kind of makes me mad. And the way I was told makes me mad.”

The post Battery Park City flooding project could ‘doom’ boating businesses faced with closing marina appeared first on New York Post.

Tags: battery park cityboatsClimate ChangeManhattanNew York City Lifesailing
Share198Tweet124Share
Paramount & Tyler Perry In Early Talks For Streaming Pact Extension – The Dish
News

Paramount & Tyler Perry In Early Talks For Streaming Pact Extension – The Dish

by Deadline
September 17, 2025

EXCLUSIVE: David Ellison’s Paramount is in early talks with Tyler Perry to extend his streaming deal beyond what it’s currently ...

Read more
News

Elizabeth Warren says there’s a hidden reason why Trump wants to end companies’ quarterly earnings requirement

September 17, 2025
News

Ex-CDC boss says RFK Jr. fired her after she went to Congress with fears about his hand-picked vaccine panel

September 17, 2025
News

Body found in towed Tesla registered to singer D4vd identified as 15-year-old girl

September 17, 2025
Music

Body Identified as Missing 15-Year-Old Girl Found in Tesla Linked to Singer D4vd

September 17, 2025
Only 13 survivors from capsized boat carrying 74 refugees off Libya: UNHCR

Only 13 survivors from capsized boat carrying 74 refugees off Libya: UNHCR

September 17, 2025
The Preventable Return of Deadly Diseases

The Preventable Return of Deadly Diseases

September 17, 2025
Turning Point USA expands its merchandise collection with items commemorating Charlie Kirk

Turning Point USA expands its merchandise collection with items commemorating Charlie Kirk

September 17, 2025

Copyright © 2025.

No Result
View All Result
  • Home
  • News
    • U.S.
    • World
    • Politics
    • Opinion
    • Business
    • Crime
    • Education
    • Environment
    • Science
  • Entertainment
    • Culture
    • Gaming
    • Music
    • Movie
    • Sports
    • Television
    • Theater
  • Tech
    • Apps
    • Autos
    • Gear
    • Mobile
    • Startup
  • Lifestyle
    • Arts
    • Fashion
    • Food
    • Health
    • Travel

Copyright © 2025.