DNYUZ
No Result
View All Result
DNYUZ
No Result
View All Result
DNYUZ
Home News

A new Kentucky AI data center will power Anthropic as part of a 20-year deal

July 6, 2026
in News
A new Kentucky AI data center will power Anthropic as part of a 20-year deal
Anthropic signed a 20-year lease for a data center being constructed in Hawesville, Kentucky.
Century Aluminum Company’s smelter in Hawesville, Kentucky. in 2017. The site was sold to Terawulf, which is developing it into a data center. The Washington Post/The Washington Post via Getty Images
  • Anthropic signed a 20-year lease with Terawulf for a new AI data center in Hawesville, Kentucky.
  • The lease is expected to generate about $19 billion of contracted revenue over the initial term.
  • The data center will have enough power capacity to support about 400 megawatts, Terawulf said.

Kentucky is set to become home to a massive new artificial intelligence data center that will power Anthropic’s AI models under a deal expected to generate nearly $20 billion in revenue.

TeraWulf, a Bitcoin mining company turned AI data center developer, announced Monday that Anthropic signed a 20-year lease for a “purpose-built AI infrastructure campus” at a former industrial site that TeraWulf acquired earlier this year in the small city of Hawesville.

The lease is expected to generate about $19 billion of contracted revenue over the initial lease term, according to TeraWulf.

“The Anthropic lease validates our strategy and establishes a long-duration revenue stream with one of the world’s leading AI companies,” TeraWulf CEO Paul Prager said in a statement.

Prager added that the lease deal with the AI firm behind Claude “creates a framework for future expansion, and demonstrates the value of our ability to source power, develop infrastructure, and secure long-term customer commitments.”

The Hawesville data center will be developed in phases. Once complete, it will have enough power capacity to support about 400 megawatts of AI computing equipment.

The campus is expected to initially provide power for AI computing during the second half of 2027 before reaching its full 401-megawatt capacity by early 2028, TeraWulf said.

Read the original article on Business Insider

The post A new Kentucky AI data center will power Anthropic as part of a 20-year deal appeared first on Business Insider.

One Canadian province is betting that being nice to Trump works
News

One Canadian province is betting that being nice to Trump works

by Business Insider
September 8, 2026

Canada has stepped up efforts to promote domestically produced goods as its trade fight with the US has intensified. Graham ...

Read more
News

All Five Killed in Miami Runway Crash Were on the Ground, Officials Say

September 8, 2026
News

Canada’s retaliatory tariffs take effect as US trade talks stall

September 8, 2026
News

Ukraine’s Defenses Are Dwindling. Putin Will Make the Most of It.

September 8, 2026
News

French A.I. Start-Up Mistral Raises $3.5 Billion as Part of Strategy Shift

September 8, 2026
Chaos at George Lucas’ Skywalker Ranch as 5 injured in structure collapse

Chaos at George Lucas’ Skywalker Ranch as 5 injured in structure collapse

September 8, 2026
Andrew Garfield says one spot in his house is his antidote to burnout

Andrew Garfield says one spot in his house is his antidote to burnout

September 8, 2026
Trump said he’ll stop Canada’s Bombardier from being sold in the US

Trump said he’ll stop Canada’s Bombardier from being sold in the US

September 8, 2026

DNYUZ © 2026

No Result
View All Result

DNYUZ © 2026