DNYUZ
No Result
View All Result
DNYUZ
No Result
View All Result
DNYUZ
Home News

NASA Delays Artemis II Moon Launch to March After Hydrogen Leaks

February 3, 2026
in News
NASA Delays Artemis II Moon Launch to March After Hydrogen Leaks

NASA announced on Tuesday that it would not try to launch astronauts on an around-the-moon trip until at least March. The decision was made after the agency was unable to complete a countdown rehearsal that started on Sunday.

NASA officials had hoped that the Artemis II mission, which would be the first time humans leave low-Earth orbit since the end of the Apollo moon landings more than 50 years ago, might be able to launch as soon as Sunday.

But that would have required a smooth run-through of what the space agency calls a wet dress rehearsal. This two-day test includes filling up the tanks of the giant Space Launch System rocket, a vehicle that includes leftover parts from the space shuttle program, with millions of pounds of liquid hydrogen and liquid oxygen propellants.

For the test run on Launchpad 39B at the Kennedy Space Center in Florida, no astronauts were aboard, and the engines would not ignite. The countdown clock was to tick down to about half a minute to check that the rocket and other systems were operating properly.

But during fueling, leaks of hydrogen occurred. That was an echo of problems that delayed for months the launch of Artemis I, an uncrewed test flight that circled the moon in 2022.

Running hours behind schedule on Monday, mission managers persevered, and the rocket’s propellant tanks were eventually filled. That allowed the countdown to proceed into the last 10 minutes. But the hydrogen leak reappeared, and the rehearsal was scrubbed shortly after midnight with about five minutes left in the countdown.

“With more than three years between SLS launches, we fully anticipated encountering challenges,” Jared Isaacman, the NASA administrator, said on social media early Tuesday morning. “That is precisely why we conduct a wet dress rehearsal. These tests are designed to surface issues before flight and set up launch day with the highest probability of success.”

In an update, NASA said the hydrogen leak during fueling had required pauses to let seals warm up and adjustments in the rate of propellants flowing into the rocket.

Other problems encountered during the countdown included a loose valve and dropouts in audio communications, the agency said.

Mission managers will review data, make fixes to the rocket and launch systems and run another dress rehearsal before setting a launch date. A NASA news conference that will provide more information is scheduled for 1 p.m. Eastern time.

“We will only launch when we believe we are as ready to undertake this historic mission,” Mr. Isaacman said.

The next available launch time is Friday, March 6, one of five possible dates in March.

Artemis II will send four astronauts — three from NASA, one from Canada — on a 10-day journey that will swing around the moon without landing. That will provide a crucial test of the life support systems on the Orion capsule before the following mission, Artemis III, is to land on the surface of the moon.

The delay of Artemis II would have cleared the way for a different NASA mission to send a new group of astronauts to the International Space Station on a SpaceX rocket.

That mission, known as Crew-12, was to launch as soon as Feb. 11. But SpaceX also encountered trouble on Monday, when the second stage of one of its Falcon 9 rockets did not perform a final engine burn to push back into the atmosphere for disposal.

The problem occurred after the rocket had successfully deployed 25 of SpaceX’s Starlink internet satellites. In a statement, SpaceX said it would investigate and make fixes before resuming Falcon 9 launches, which include the Crew-12 mission.

Russia’s ability to launch astronauts to orbit is also grounded for the moment after a service platform at the launch site was badly damaged in November. In December, Roscosmos, the state corporation that oversees Russia’s space program, said the launchpad would be repaired by the end of February.

Kenneth Chang, a science reporter at The Times, covers NASA and the solar system, and research closer to Earth.

The post NASA Delays Artemis II Moon Launch to March After Hydrogen Leaks appeared first on New York Times.

Grindr is testing a premium AI tier with prices up to $499 a month
News

Grindr is testing a premium AI tier with prices up to $499 a month

by Business Insider
February 3, 2026

Grindr's new "Edge" is testing at some hefty price points. Spencer Platt/Getty ImagesGrindr is testing a new AI subscription tier ...

Read more
News

Person fatally struck by car on Pacific Coast Highway in Malibu

February 3, 2026
News

Archaeologists discover ‘elite site’ on land once owned by legendary English king

February 3, 2026
News

Iran’s killing of protesters reached level rarely seen, emergent count shows

February 3, 2026
News

Kairos, which is building a cross-platform tool for prediction markets traders, raises $2.5 million from a16z crypto

February 3, 2026
Hilary Knight’s hockey achievements go beyond gold medals and championships

Hilary Knight’s hockey achievements go beyond gold medals and championships

February 3, 2026
Hilary Knight’s hockey achievements go beyond gold medals and championships

Hilary Knight’s hockey achievements go beyond gold medals and championships

February 3, 2026
A 7-Year-Old Overdosed on GLP-1 Drugs, and She Isn’t the First or Last Kid to Do It

A 7-Year-Old Overdosed on GLP-1 Drugs, and She Isn’t the First or Last Kid to Do It

February 3, 2026

DNYUZ © 2026

No Result
View All Result

DNYUZ © 2026